Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T16RW02331
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/07/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | work is finally complete. New bore on North side of Grant because conduit was stretched during initial pull. 4 small patches on Grant have been repaired and two sections of sidewalk were replaced on the South side of Grant, the second time because the sweep up the pole could not be mandreled, Sweep was changed. No issues | |
11/30/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | This job has been a nightmare, still need to bore across grant, but cannot work until 1/2/17 in roadway. sidewalk on south side was opened for holiday traffic, still needs to be repaired | |
11/18/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | 11/14 potholing on aracadia, contractor is working nights all week 11/15/16 starting shooting bore westbound on North side of grant. 11/16/17 back to potholing in right of way on North side of Grant 11/17/16 double lane closure for Eastbound and Westbound grant for todays potholing. Contractor will shoot the bore on Monday Night. Issues with traffic and equipment. Contractor was also informed that they will not be allowed on the road as of wednesday 11/23 becuase of holiday restrictions. |