Permit: T16RW02237

Parcel: 12407190E


Addresses:

801 E 12TH ST


Inspection Status: Continued

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Permit Number - T16RW02237

Inspection Description - TDOT-EXCAV GENERAL INSPECTION

Inspection Status - Continued

Date Description Inspector Results Comments
01/24/2017 TDOT-EXCAV GENERAL INSPECTION Continued all work complete in city right of way
01/24/2017 TDOT-EXCAV GENERAL INSPECTION Approved
01/19/2017 TDOT-EXCAV GENERAL INSPECTION Continued
01/13/2017 TDOT-EXCAV GENERAL INSPECTION Continued
01/11/2017 TDOT-EXCAV GENERAL INSPECTION Continued
01/10/2017 TDOT-EXCAV GENERAL INSPECTION Continued Met with cont. to make changes on sidewalk pour around stop sign.
01/09/2017 TDOT-EXCAV GENERAL INSPECTION Continued
01/05/2017 TDOT-EXCAV GENERAL INSPECTION Continued Met with Nick from Kroll Contracting. Rejected submittals for ABC with RAP for use in driveway within RWY. Method C used to attain proctor. Per Tony Espinoza at the lab, city requires method A. In addition, no L.A.abrasion test has been submitted. Inspector has concerns about structural longevity in driveway subject to large busses. Recieved call from contractor who said the engineer is in contact with Lance Peterson.
01/05/2017 TDOT-EXCAV GENERAL INSPECTION Continued MET WITH CONT. AND TOM A. FOR USING AB AND COMPACTION TESTING ( SEE TOM"S NOTES)
12/28/2016 TDOT-EXCAV GENERAL INSPECTION Continued ASKED CONT. TO RENEW PERMIT
12/20/2016 TDOT-EXCAV GENERAL INSPECTION Continued
12/13/2016 TDOT-EXCAV GENERAL INSPECTION Continued
11/16/2016 TDOT-EXCAV GENERAL INSPECTION Continued
11/14/2016 TDOT-EXCAV GENERAL INSPECTION Continued
11/10/2016 TDOT-EXCAV GENERAL INSPECTION Continued
11/08/2016 TDOT-EXCAV GENERAL INSPECTION Continued NO CONFLICT
10/31/2016 TDOT-EXCAV GENERAL INSPECTION Continued Inspected forms and subgrade for curb access ramps in driveway on 12th. Ok'd contractor to pour.
10/27/2016 TDOT-EXCAV GENERAL INSPECTION Continued MET WITH CONT. TO GO OVER WHAT IS NEEDED TO WORK IN RIGHT OF WAY