Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T16RW02237
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | all work complete in city right of way | |
01/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | ||
01/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
01/13/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
01/11/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
01/10/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Met with cont. to make changes on sidewalk pour around stop sign. | |
01/09/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
01/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Met with Nick from Kroll Contracting. Rejected submittals for ABC with RAP for use in driveway within RWY. Method C used to attain proctor. Per Tony Espinoza at the lab, city requires method A. In addition, no L.A.abrasion test has been submitted. Inspector has concerns about structural longevity in driveway subject to large busses. Recieved call from contractor who said the engineer is in contact with Lance Peterson. | |
01/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET WITH CONT. AND TOM A. FOR USING AB AND COMPACTION TESTING ( SEE TOM"S NOTES) | |
12/28/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ASKED CONT. TO RENEW PERMIT | |
12/20/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
12/13/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
11/16/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
11/14/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
11/10/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
11/08/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | NO CONFLICT | |
10/31/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Inspected forms and subgrade for curb access ramps in driveway on 12th. Ok'd contractor to pour. | |
10/27/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET WITH CONT. TO GO OVER WHAT IS NEEDED TO WORK IN RIGHT OF WAY |