Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/19/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Perm patch complete. No concerns. |
| 11/18/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
ASKED TO HAVE VP'S OUT OF BIKE LANE |
| 11/07/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor installed app 200' of pipe. Pipe is in place to tie in point and is ready for testing. All compaction tests were acceptable. Cold mix was placed and barricades were down by 0600 per permit requirements. |
| 11/01/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor installed app 180' of pipe in center turn lane. All compaction tests were acceptable. Cold patch was placed and all barricades were down by 0600 per permit requirements. |
| 10/31/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Janc installed pipe across WB lane and started turn to West. A-Tech tested backfill for compaction and all tests were acceptable. Allowed Janc to start installing backfill in 1' lifts and after several passing tests allowed to test every second lift. Cold patch installed and barricades were removed by 0600 per permit requirements. |
| 10/10/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Not ready for Inspection |
|
| 10/07/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Not ready for Inspection |
|