Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/07/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Tricon backfilled the area because they are having issues with Tucson water on the amount of work. Wheel chair ramp will still have to be replaced. Temp ashalt patch in area until issues can be resolved | |
| 10/31/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | 10/17/16 existing 8 in line started leaking. Tucson water and Tricon was notified. Area was repaired. No other work in area. 10/31/16 Tricon backfilled the area and temp. opened the are back up. No repairs as of yet. Tricon and Tucson water are in disagreement on issues. Permit expires on 11/6/16 |
|
| 10/14/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Tricon started construction today, excavated the two valves which need to be replaced. Concrete and asphalt damaged during the excavation will be replaced by Tricon |