Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/04/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
11/1/16 Tucson asphalt repaired southbound water repair and on 11/4/16 they repaired the northbound lane. Tucson asphalt did a nice job with both patches on Rosemont. A high early concrete was used up until asphalt level, then the area was patched with a PAG 11. No issues for either patch |