Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/27/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
There is a 12 x 80 patch on Glenn, it looks like two patches back to back, Tucson water did not notify me of the work, so i do not have the asphalt ticket for a mix desighn. The patch looks good with no other issues |