Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | Complete. No concerns. | |
| 11/18/2016 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | CURB NEEDS REPAIRED PERMIT EXPIRED |
|
| 10/11/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | FIRST PANEL OF SIDEWALK SOUTH OF DRIVEWAY IS TO HIGH. TOLD MIKE TO CALL ME FOR REINSPECTION. PAINTED AREA THAT WAS TOO HIGH. | |
| 10/11/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | CALLED FOR REINSPECTION AT 1141 AM. THE GRADE HAS NOT BEEN TOUCHED. STILL TO HIGH. TOLD HIM TO CALL FOR REINPECTION | |
| 10/11/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | CALLED AGAIN AT 1234 FOR REINPECTION. FOR CONCRETE POUR AT 1PM. TOLD HIM NOT TO POUR UNTIL I GET THERE. | |
| 10/11/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ARRIVED AT 105PM CONCRETE TRUCK ON SITE. GRADE IS NOW GOOD BUT NEEDS WATER AND COMPACTION. I CALLED MIKE HE CALLED CONCRETE GUYS. I WATCHED HIM ADD WATER AND RECOMPACT. TOLD HIM HE CAN NOW POUR CONCRETE. | |
| 10/10/2016 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 09/26/2016 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 09/23/2016 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |