Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/05/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
most of the work was performed the week of 9/15/16, ariel on the west side of Kolb. No issues with traffic control. eastbound lane of speedway was excavated at green acres. Small asphalt patch was needed for the storage facilty and Circle k. Patches are in right of way behind driveways. No issues with job |