Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T16RW00839

Parcel: 13323164A


Addresses:

7150 E SPEEDWAY BL

Inspection Status: Approved

Inspection History: TDOT-Routine Barricade Inspect

Date Description Inspector Results Comments
08/18/2016 TDOT-Routine Barricade Inspect Approved 8/8/16 forming concrete
8/9/16 pouring concrete. All material approved
8/12/16 concrete poured
8/17/16 all asphalt patching complete
all work was monitored, the job was pushed back a few days due to weather. the contractored did everything that was asked, and was appreciated because the CFO was already issued
08/16/2016 TDOT-Routine Barricade Inspect Continued 8/8/16 forming sidewalk
8/9/16 pouring sidewalk, concrete checked and oked
8/12/16 poured more concrete. No issues
8/15/16 needs all asphalt patching
08/05/2016 TDOT-Routine Barricade Inspect Continued
08/04/2016 TDOT-Routine Barricade Inspect Continued
08/03/2016 TDOT-Routine Barricade Inspect Continued
08/02/2016 TDOT-Routine Barricade Inspect Continued
08/01/2016 TDOT-Routine Barricade Inspect Continued TALKED TO SW BARRICADES AND TOLD HIM HE COULD GO 24 HOURS ON SIDEWALK REMOVAL. THEY NEED A RIGHT LANE CLOSURE FOR PED ACCESS.
08/01/2016 TDOT-Routine Barricade Inspect Continued