Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | paved today. edges were tacked, grade held up to a loud test and PAG 2 from vulcan used. Traffic control picked up and job is complete | |
| 08/25/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | 7/29/16 working on site, excavating area 8/3/16 pima county inspector asked to remove plastic and install D.I.P under roadway 8/11/16 nobody on site called contractor and told him to plate area and open the road back up 8/16/16 wanted to pave but A.B.C was pumping very bad. No ashalt since and now permit is expired. |
|
| 08/25/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/23/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | area still has plates, contractor needs to pave soon | |
| 07/25/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Spoke with contractor by phone. Gave ok to proceed with excavation on 7/26/16. Contractor to call M. Bravin upon commencement. |