Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/03/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Area still has a temp patch. permit has expired |
| 11/02/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
No work on temp Patch as of yet |
| 10/25/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
work was complete, temp patch still in place, permit has expired |
| 09/19/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
temp patch in place, needs PCCP repair, permit has expired |
| 09/19/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
PCCP needs repaired. Permit has expired |
| 09/16/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
temp patch still in place, expires on monday |
| 09/15/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
9/12-9/16 temp patch still in place |
| 09/12/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
temp patch still in place, concrete patch with dowels needed |
| 09/12/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
|
| 08/25/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
work started on 8/24/16. The contractor had a issue if they were allowed to jack hammer the P.C.C.P, Lance peterson was called and asked, Lance said there was no structual issues with the overpass and they can continue. |
| 08/25/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
8/25/16 contractor was informed that the concrete repair needed dowels and to be reinstalled 12 in. thick. All work performed in the gore area. No bridge issues |