Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Job is now complete, a few important dates. precon was held on 7/21/16. main line was installed throughout the duration of the project, S.W had a inspector on site throughout the project. Patching was done on the week of9/19/16 and a job walkthrough was conducted on 10/13/16, small punch list was given and completed by 10/14/16. patching rides ok, contractor could have taken more care of cutting and matching joints, but they argued for the extra asphalt, concrete and driveways were replaced at the nearest joints. Contractor was not happy about the extra material. Nieghborhood is old and there was not alot of sidewalk or driveway repair needed. No issues. Closed |