Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | Tucson water did repairs to the pipe. Temp patch in place on until 8/23 . a 17 x10 perm patch and convrete collars in place on 9/6/16. No issues |