Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SITE REVIEW
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2017 | SIGN SITE REVIEW | Approved | The permit is approved; it will be issued when payment is received. | |
| 08/18/2016 | SIGN SITE REVIEW | Partial Approval | This is a list of items we need to approve the Krispy Kreme sign. 1.A Revision of the application (see attached PDF) 2.Need a drawing of the entire sign showing the footings. 3.Because this sign has exposed red neon. You will have to get an Outdoor Lighting approval stamp. Meet with Dan Santa Cruz at the electrical counter He only works 8 am to 9:30 am (90 mins) M-F |