Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
Permit Number - T16OT00876
Inspection Description - COT - ENGR - Signage Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - ENGR - Signage Final | Not Ready | ||
08/24/2016 | COT - ENGR - Signage Final | BWIESE | Approved | Entered by BWIESE1 - The permit is approved; it will be issued when payment is received. |
08/01/2016 | COT - ENGR - Signage Final | bwiese | Partial Approval | Entered by BWIESE1 - UHAUL - 1051 E. Benson Hwy Below is a list of the revisions/additions that are needed to continue this review. 1. The overall limit for square footage on this freeway sign is 360 sq ft. Current submittal is over, due to the fact that the top signage "UHAUL" is one word and therefore is measured as one entity.(the open space between the letters is not subtracted from the overall length (34 feet)) 2. The engineering calculations are needed for the onsite field welding. 3. The engineering calculations are needed for the footer selection. 4. The grade differential (travel lane to base of sign) does not match on all of the drawings supplied. One indicates 7 feet and another indicates 6 feet. 5. Indicate on the drawing that the existing Freeway sign is to be removed prior to installation of the new sign. Email all revisions/additions to me brian.wiese@tucsonaz.gov |