Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/12/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
5/9/15 Precon on site. 5/11/16 the area was overexcavated and compacted. Malcolm from southern az testing performed compaction tests. They were accepted. Vulcan supplied the material for paving on 5/12/16. Richard Leigh approved not installing the header curbs per plan because Broadway will be under construction soon. A thicken edge was installed. |