Inspection History Details
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Temp Patch in Concrete |
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Temp Patch in Concrete |