Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T16EX00831

Parcel: 11713177A


Addresses:

201 S STONE AV

Inspection Status: Continued

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
04/29/2017 TDOT-EXCAV GENERAL INSPECTION Continued Cont, renewed permit
04/03/2017 TDOT-EXCAV GENERAL INSPECTION Approved Permit office gave cont, new permit see (T17RW01435
03/29/2017 TDOT-EXCAV GENERAL INSPECTION Continued Told cont, to renew permit. Called city office to triple fee this time
03/23/2017 TDOT-EXCAV GENERAL INSPECTION Continued Asked cont, to renew permit,
03/09/2017 TDOT-EXCAV GENERAL INSPECTION Continued
03/07/2017 TDOT-EXCAV GENERAL INSPECTION Continued
03/01/2017 TDOT-EXCAV GENERAL INSPECTION Continued
02/21/2017 TDOT-EXCAV GENERAL INSPECTION Continued
02/13/2017 TDOT-EXCAV GENERAL INSPECTION Continued
02/09/2017 TDOT-EXCAV GENERAL INSPECTION Continued
02/02/2017 TDOT-EXCAV GENERAL INSPECTION Continued forms ok to pour on south side & north side
01/27/2017 TDOT-EXCAV GENERAL INSPECTION Continued Met with cont, to with concerns with sidewalk and deco, drain
01/20/2017 TDOT-EXCAV GENERAL INSPECTION Continued
01/10/2017 TDOT-EXCAV GENERAL INSPECTION Continued
12/20/2016 TDOT-EXCAV GENERAL INSPECTION Continued
12/06/2016 TDOT-EXCAV GENERAL INSPECTION Continued
11/23/2016 TDOT-EXCAV GENERAL INSPECTION Continued
11/17/2016 TDOT-EXCAV GENERAL INSPECTION Continued
11/08/2016 TDOT-EXCAV GENERAL INSPECTION Continued
10/07/2016 TDOT-EXCAV GENERAL INSPECTION Continued ASKED CONT. TO RENEW PERMIT
08/29/2016 TDOT-EXCAV GENERAL INSPECTION Continued
08/28/2016 TDOT-EXCAV GENERAL INSPECTION Continued NO CONFLICT
05/20/2016 TDOT-EXCAV GENERAL INSPECTION Continued Curb Subgrade passed compaction. Pouring 3 curb returns for ADA ramps and 2 sections of new curb along Stone Ave.
05/09/2016 TDOT-EXCAV GENERAL INSPECTION Continued Meeting with AF Sterling and Rons Concrete to discuss 3 ADA ramps.