Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/13/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Final. No Further Concerns. |
| 08/03/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Form check on ADA Ramps on Drachman/Vine. Need to remove existing wing curb to make elevations work. Ok to pour curb after removal. |
| 07/11/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Discussed replacement of 2 ADA ramps removed/damaged by excavation. |
| 03/22/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Final pave. Temp pave on SW and some curb area until phase 2. |
| 03/21/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Slurry set up ready to pave Sat morning 7am. |
| 03/17/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Flint from UCCo says cant get CLSM #2 from plant. Ok to use product #400205 2 sack sand slurry mix instead per Lance P. |
| 03/14/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Emailed Flint from UCCo the spec on PAG 2 AC. Call from Andi (UCCo) to confirm PAG 2 spec. |
| 03/14/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Site visit to view progress. |
| 03/10/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Met with Tom A. and UCCo. On site. CLSM #2 backfill on all trenches. TTop asphalt patches on all trenching in roadway. |