Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T16DV07630
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2016 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, MET WITH MANAGER MELLISA LARUE WHO WALKED ME BACK TO THE GREEN HOUSE IN QUESTION. MELLISA STATED SHE HAS BEEN WORKING THERE AND THE GREEN HOUSE HAS BEEN THERE SINCESHE STARTED. M Y INSPECTION FOUND A DOUBLE 2 X 6 LEDGER NAILED TO EXISTING 6" X 24" BEAMS ABOUT EVERY 4 TO 6 FT. RAFTERS EVERY 2 FT O/C HANGERED ONTO THE LEDGER AND SAT ON TOP OF A 2 X 4 WALL DIRECT BEARING UNDER EACH STUD IN THE WALL ALSO 2 FT O/C. THERE WAS CORRIGATED FIBERGLASS ON TOP OF THE RAFTERS AND NAILED TO THE OUTSIDE OF EACH WALL. PROPER CONNECTORS WERE ATTATCHED. GREEN HOUSE WAS APPROX 14 FT X 24 FT. I MET WITH BUILDING OFFICIAL CLAYTON T. WHO STATED IF THE ADDED GREENHOUSE HAS WINDOWS WITHIN THE GREENHOUSE THAT BELONG TO THE MAINSTRUCTURE, OR ORIGINALLY CONSTRUCTED WITH THE MAIN STRUCTURE THEN YES THE GREEN HOUSE WOULD NEED TO BE SPRINKLED, AND PERMITS REQUIRED.0 |