Case Number - T16DV04391

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
11/28/2017 INSP - FOLLOW UP CODE ENFORCE Approved Met with contractor and reviewed the old plans and determined the light fixtures have been moved not added. Need to confer with the Building Official.
11/28/2017 INSP - FOLLOW UP CODE ENFORCE Approved Building official is now OK with the findings on the case. Reviewers have an engineer woring on plans and permits for solar awnings. Supervision has authurized to close case.
11/22/2017 INSP - FOLLOW UP CODE ENFORCE Approved New contractor called and has original plans for new light fixture. Meeting next week to verify.
11/13/2017 INSP - FOLLOW UP CODE ENFORCE Approved New contractor has been contacted for the job. He contacted me to understand what the scope is envolved. A new Engineer is also involved.
10/04/2017 INSP - FOLLOW UP CODE ENFORCE Approved See Phone conditions
10/03/2017 INSP - FOLLOW UP CODE ENFORCE Approved Spoke with pastor Troy. He will cintact the general contrctor to immediately move forward in getting the correct plans to PDSD.
07/27/2017 INSP - FOLLOW UP CODE ENFORCE Approved Met with Pastor, Electriction and contractor. There has been a mixup in which permit and which plans show work being done. They understand what needs to be done with PDSD to rectify.
07/11/2017 INSP - FOLLOW UP CODE ENFORCE Approved Found New Solar on front of building walkways. Need to call Pastor.
06/16/2017 INSP - FOLLOW UP CODE ENFORCE Approved See conditions.
04/20/2017 INSP - FOLLOW UP CODE ENFORCE Approved Permit T17CM02883 has been applied for and is in review.
02/01/2017 INSP - FOLLOW UP CODE ENFORCE Approved Met with the Pastor Troy at the main campus. He called the electrician who explained he has been to PDSD and is in the process of finding cut sheets for the fixtures to show the lumens for the parking lot.
12/21/2016 INSP - FOLLOW UP CODE ENFORCE Approved See conditions.
11/22/2016 INSP - FOLLOW UP CODE ENFORCE Approved Spoke with the groundskeeper as he is the only one on site. He will notify the church of the situation.
10/17/2016 INSP - FOLLOW UP CODE ENFORCE Approved Met with the electrical contractor and the pastor. Discussed what is needed for the permit for the new loght poles.
08/26/2016 INSP - FOLLOW UP CODE ENFORCE Approved Super Saldate conducted on site Inspection in order to review case. Inspection did find the canopy lights, appear not to have shiedling and are in off position at the time. Spoke with Dywan who is the Engineer for the Church to inform him of the need to kep the lights off until the assocaited permit is finaled. He stated he would communicate this information to Calvery.