Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T16DV04056
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/05/2016 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, MET WITH TPD OFFICERS. A SIVER NISSAN ALTIMA IN THE PARKING LOT OF GOODWILL DONATION CENTER WAS PARKING HIT THE ;GAS PEDDLE INSTEAD OF THE BRAKE, JUMPED THE PARKING STOP AND ENTERED THE SOUTH/WEST CORNER OF THE STRUCTURE. DAMAGE IS AS FOLLOWS: >APPROX 4 FT X 10 FT AREA OF ROCK FACADE DAMAGED >4 TO 5 METAL STUDS AND BOTTOM TRACK WAS DAMAGED >EXTERIOR OSB SHEAR STUCCO DAMAGED APPROX 10 FT X 10 FT. >APPROX 10 FT X 10 FT OF DRYWALL DAMAGED >ELECTRIC, PLASTIC CONDUIT DAMAGED, (3) LINES OF CONDUIT WERE SHEARED OFF AT THE FLOOR. APPEARED THERE WAS WIRING IN ONLY ONE OF THE CONDUIT LINES. POWER TURNED OFF AT THE DICONNECTS. >3/4 INCH COPPER PLUMBING LINE TO EXTERIOR HOSE BIBB WAS DAMAGED AND PUSHED INWARDS. AND A AIR LINE FOR THE EXTERIOR ALSO DAMAGED. TPD WAS UNABLE TO LOCATE OR CONTACT THE OWNER. TPD PICKED THE LOCK TO GAIN ENTRY.POWER WAS TURNED OFF TO THE MAIN DISCONNECT. STRUCTURE BOARD BY ARCADIAN AT THE S/W CORNER |