Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2017 | PLUMBING - INTERMEDIATE | Approved | ||
| 07/31/2017 | PLUMBING - INTERMEDIATE | Denied | 1- SHALL PROVIDE THE REQUIRED NAIL PLATES ON ALL TOP AND SOLE PLATES FOR THE DWV PENETRATIONS AS REQUESTED. | |
| 07/28/2017 | PLUMBING - INTERMEDIATE | Denied | 1- SHALL STRAP DOWN THE GAS LINE. 2-SHALL PROVIDE THE REQUIRED NAIL PLATES ON ALL TOP AND SOLE PLATES FOR THE DWV PENETRATIONS. |