Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2017 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 03/06/2017 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/02/2017 | BUILDING - FINAL | Not ready for Inspection | verify 2" duct liner at roof top duct no white wires to hot legs provide access to roof hammer arresters at laundry no PVC at T&P drain |
|
| 01/20/2017 | BUILDING - FINAL | Denied | 1-expose covered work all through house, the whole house has been rewired 2-provide pressure treated bottom plates 3-roof top duct to have 2" insulation 4-add plumbing work to permit, plumbing has been installed without permits or inspections |