Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/17/2017 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/10/2017 | PLUMBING - ROUGH, SOIL | Denied | SOIL WET FILLL GREASE TRAP |
|
| 02/08/2017 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE APPROVED MATERIAL FOR ALL EXPOSED DWV PIPING LOCATED AT THE EAST EXTERIOR WALL. 2- REMOVE AND REPLACE ALL FERNCO COUPLINGS AND PROVIDE SOLVENT WELD COUPINGS OR MISSION SPECIALTY COUPLINGS. 3- SHALL REMOVE ALL DISSIMULAR MATERIAL (ABS) AND REPLACE WITH SCH. 40 PVC MATERIAL. 4- SHALL FILL THE GREASE INTERCEPTOR UP TO THE UOTLET OF TRAP. * |