Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/02/2017 | BUILDING - FINAL | Approved | ||
| 07/28/2017 | BUILDING - FINAL | Partial Approval | 1- BLDG. FINAL IS OKAY FOR C OF O PENDING REPORTS REVIEW. | |
| 07/14/2017 | BUILDING - FINAL | Denied | 1- PROVIDE ADDRESS ON BUILDING 2- SHALL PROVIDE A PERMANATE LABEL ON CEILING TILES FOR ANZUL VALVE LOCATION. 3- SHALL PROVIDE ACCESSIBILITY SIGNAGE. 4-ACCESSIBLE WATER CLOSETS EXCEED THE MAXIMUM SIDE WALL DISTANCE. 5- SHALL SEAL THE SEAL TIGHT ELECTRICAL WHIPS TO THE EQUIPMENT ON ROOF. NOTE: THIS IS NOT A COMPLETE INSPECTION. SHALL |