Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2016 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 12/12/2016 | PLUMBING - GAS PRESSURE TEST | Denied | 1- SHALL PROVIDE AN AIR PRESSURE TEST ON THE ENTIRE SYSTEM AT THE TIME OF INSPECTION REQUEST. 2- SHALL PROVIDE A GAS BOND FROM THE THE COLDWATER SUPPLY TOTHE GAS LINE WITH A NUMBER 6 COPPER WIRE. 3- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR. |