Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2016 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 12/06/2016 | PLUMBING - FINAL | Denied | 1- SHALL PROVIDE AN AIR PRESSURE TEST ON THE ENTIRE GAS SYSTEM WITH A 15 LB MAX 1/10TH INCREMENTS TEST GAGE AT THE TIME OF INSPECTION REQUEST. 2- SHALL PROVIDE AN APPROVED METHOD OF STRAPING THE GAS LINE TO THE EXTERIOR WALL AND GAS SUPPLY DROP TO WATER HEATER. SHALL PROVIDE A AIR VENT MINIMUM OF 10 X 10 LOCATED 12" ABOVE FLLOR. 4- SHALL PROVIDE ACCESS TO THE ROOF. 5- SHALL PROVIDE A GAS BOND. 6- SHALL PROVIDE A ROOF JACK AND SEAL THE ROOF PENETRATION. |