Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2018 | BUILDING ABOVE CEILING | Approved | UNIT 2 COMPLETE | |
| 05/30/2018 | BUILDING ABOVE CEILING | Partial Approval | UNIT # 4 APPROVED. TRUSS FIX APPROVED. SUPPLY BLOCKING UN UNIT #2. |
|
| 04/27/2018 | BUILDING ABOVE CEILING | Not ready for Inspection | INCORRECT TRUSS DRAWINGS | |
| 04/26/2018 | BUILDING ABOVE CEILING | Denied | ROOF TRUSSES HAVE BEEN CUT/ MODIFIED, RE-INSPECT ROOF TRUSSES ON ALL UNITS IN BUILDING #5. INCORRECT FIRE CAULK ON FIRE WALL IN BUILIDNG #5. RE INSPECT ALL FIRE WALLS IN BUILIDNG #5. HOLE IN FIREWALL IN UNIT #4. UNIT #4, DUCT IS NOT CONNECTED TO ANYTHING IN BATHROOM. SUPPORT VENTS ON THREE SIDES. |
|
| 04/24/2018 | BUILDING ABOVE CEILING | Denied | UNITS 1 THRU 7 INSULATE PORCH ROOF WATER SUPPLY EXTEROIR ELECTRICAL LIGHT BOXES MISSIG GOUND SCREW SECURE HATING VENTS ON THREE SIDES CLEAR SPACE AT AIR HANDLER OPENING IN CEILING. REPAIR CONCRETE AT TOILETS AND FASTEN FLANGE TO FLOOR SECURE VERTICAL DVW PIPING. |