| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2017 | PLUMBING - SEWER HCS CONNECT | Approved | IVRS - Inspection :* | |
| 03/30/2017 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1- BLDG. SEWER AIR PRESSURE TEST PROVIDED. | |
| 03/29/2017 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1- BLDG.SEWER IS OKAY UP TO THE BLDG. DRAIN STUBB OUT. CONNECTION NOT MADE. 2- SHALL PROVIDE AN AIR PRESSURE TEST ON THE SEWER SYSTEM 5 PSI MINIMUM. |
|
| 03/28/2017 | PLUMBING - SEWER HCS CONNECT | Not ready for Inspection | ||
| 03/24/2017 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1- 4" SDR-35 FROM C.O. #4 UPSTREAM TO THE STREET ISLAND ONLY. TRACER WIRE PROVIDED. 2- OKAY TO BACKFILL TRENCH AT OWN RISK. |
|
| 03/23/2017 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1- SITE SEWER FROM C.O.#3 UPSTREAM TO C.O. #5 IS OKAY TO BACKFILL. TRACER WIRE PROVIDED. | |
| 03/22/2017 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1- 4" SDR-35 SITE SEWER FROM THE EXISTING 8" SEWER MAIN TAP UPSTRAM TO THE SECOND C.O. IS OKAY TO COVER AS NOTED ON PLAN. TRACER WIRE PROVIDE. 2- AIR PRESSURE TEST SHALL BE PROVIDED AT A LATER TIME. COVER AT YOUR OWN RISK. |
|
| 03/17/2017 | PLUMBING - SEWER HCS CONNECT | Partial Approval | 1- ATTENDED A PRE CONSTRUCTION MEETING WITH THE UTILITY CONTRACTOR ON THE INSTALLATION AND INSPECTION COORDINATION. |