Inspection Status: Approved
Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/02/2017 | FIRE - FINAL | Approved | ||
| 03/15/2017 | FIRE - FINAL | Partial Approval | Call when the Knox gate key is installed so that we can verify proper operation. Ok for C of O | |
| 02/24/2017 | FIRE - FINAL | Denied | Regarding the gates up front you will need to do the following: Section 503.6.1 Electric operating gates. Gates that use electric or other means of power to automatically open or unlock shall have a manual override system. Manual override controls shall be located on the entrance side of gate, or when power has failed, the gates(s) shall open and stay open until power is restored for normal operations. Regarding the address you will need to do the following: Commercial Building < 50 feet from the curb require 12" numbers displayed on the building. Buildings > 50 feet from the curb require 15" numbers displayed on the building. fire extinguishers every 75' of travel. Move the emergency light so that it is in proper view. |