Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/04/2019 |
ENGINEERING - FINAL |
|
Approved |
|
| 12/14/2018 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
All inspections not ready no address posted address goes from 224 to 28 to 46 cannot find 238 I found a building with no address but it’s locked and nobody’s on site I called the number on the permit at 9:26 left a message that the customer will have to call for inspection and be best to post the address |
| 12/14/2018 |
ENGINEERING - FINAL |
|
Partial Approval |
COMPLETE ALL WORK FOR THE DEVELOPMENT PACKAGE PRIOR TO SCHEDULING THIS INSPECTION. |