Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/08/2017 | PLUMBING - ROUGH, SOIL | Approved | ||
| 03/07/2017 | PLUMBING - ROUGH, SOIL | Partial Approval | 1- DWV WATER TEST PROVIDED. 2- NOTE; SHALL REMOVE THE FERNCO COUPLINGS AT THE POINT OF CONNECTION OF THE NEW BLDG. DRAIN TO THE EXISTING BLDG. DRAIN AND PROVIDE A MISSION SPECIALTY COUPLINGS. OKAY TO BACKFILL TRENCH UP TO THIS POINT. |