Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T16CM08663
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/18/2017 | BUILDING - FINAL | Approved | ||
05/15/2017 | BUILDING - FINAL | Denied | 1- SEE NOTE # 5 AND THE DOMWSTIC WATER ISOMETRIC DRAWING SHOWING THE CIRCUIT SETTERS (BALANCE VALVES) CONTROL VALVES AND CHECK VALVE. 2- I SPOKE WITH THE G.C. AND PLBG. CONTRACTOR AND THEY STATED THAT THEY WILL PROVIDE A SEALED LETTER FROM THE MECHANICAL ENGINEER THAT HE WILL ACCEPT THE HOT WATER RETURN SYSTEM THAT WAS INSTALLED NOT AS PER THE APPROVED PLANS. |
|
05/12/2017 | BUILDING - FINAL | Not ready for Inspection | ||
05/11/2017 | BUILDING - FINAL | Denied | 1- ACCESSIBLE WATER CLOSET SIDE WALL CLEARANCE SHALL BE WITHIN 16" TO 18" TO THE CENTER OF THE WATER CLOSET MAX. 2- SHALL PROVIDE HAMMER ARRESTORS FOR THE A.W. 3- SHALL CAULK THE DRINKING FOUNTAIN AND MOP SINK. 4- SHALL CONNECT THE THE ELECTRIC CONDUCTORS TO THE WATER HEATER. 5- SHALL INSTALL THE RECIRCULATION PUMP AS PER THE APPROVED DRAWINGS AND SECURE THE EXPANSION TANK. 6- SEE NOTES 3, & 4. 7 SHALL INSTALL GRAB BARS AS PER THE ANSI STANDARDS. 8- SHALL LOCATE THE ACCESSIBLE LAVATORY RIM 34" A.F.F MAX. 9 SHALL LOCATE OR PROVIDE THE TRAP PRIMERS FOR THE FLOOR DRAINS IN THE RESTROOMS. |
|
05/08/2017 | BUILDING - FINAL | Denied | 1- PLUMBING IS INCOMPLETE. 2- H.C. WATER CLOSET FLUSH HANDLES SHALL BE LOCATED ON THE OPEN SIDE OF ROOM. 3- ELECTRICAL RECEPTICALS AT THE LOUNGE SINK COUNTERTOP ARE LOOSE. 4- H.C. WATER CLOSETS REQUIRE OPEN FRONT SEATS. 5- INSPECTION STOP. THIS IS NOT A COMPLETE INSPECTION. |