Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2016 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/18/2016 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE AN APPROVED DRAWING SHOWING NEW GAS LINE AND BTH TO CFH DEMAND. 2-SHALL BOND THE GAS LINE. 3- SHALL REMOVE THE TRAPPED WATER ON THE WATER HEATER T & P DRAIN. * |