Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/28/2016 | PLUMBING - FINAL | Approved | APPROVED | |
| 11/23/2016 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A MINIMUM OF 10 X 10 AIR VENTS LOCATED WITHIN 12" DOWN FROM CEILING AND 12" ABOVE THE PLATFORM FOR COMBUTION AIR. 2- SHALL PROVIDE GAS LINE BOND. 3- SHALL EXTEND THE FURNACE AND WATER HEATER FLU VENT 3' 0" ABOVE THE COOLER. 4- SHALL TIGHTEN UP THE UNISTRAP CLAMPS AT THE GAS LINE DROP TO METER. 5- SHALL PROVIDE A CARBON MONOXIDE DETECTOR. * |