Permit: T16CM08585

Parcel: 13321075A

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T16CM08585

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
03/27/2017 ENGINEERING - FINAL Approved
03/27/2017 ENGINEERING - FINAL Partial Approval WORK FOR THE UNIT IS COMPLETE ON THE EXTERIOR BUT WE ARE STILL WAITING FOR THE SITE WORK TO BE COMPLETED
03/24/2017 ENGINEERING - FINAL Partial Approval WAITING FOR THE SITE DP TO BE COMPLETED.
03/24/2017 ENGINEERING - FINAL Partial Approval THE FINAL ENGINEERING FOR THIS SITE CANNOT BE CLOSED AT THIS TIME SINCE THE CONTRACTOR CONTINUES TO WORK IN THE ENTRYWAY INTO THE BUILDING. 2) STILL WAITING FOR THE COMPLETION OF THE DP PERMIT FOR THIS SITE.

I HAVE ADVISED THE CONTRACTOR FOR THE SITE THAT THE TILE CREW IS WASHING THEIR EQUIPMENT IN THE DRAINAGE AREAS ON THE WEST SIDE OF THE BUILDING, ALL OF THIS MATERIAL WILL HAVE TO BE REMOVED AND RECHECKED PRIOR TO THE FINAL APPROVAL OG THE SITE.
01/05/2017 ENGINEERING - FINAL Not ready for Inspection 1) COMPLET SHELL AND DP PERMITS . 2) CONTRACT WOR FOR THE TI IS STILL TAKING PLACE IN THE ENTRY WAY INTO THIS AREA.