Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
Permit Number - T16CM08564
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/26/2018 | FIRE SPKLR - FINAL | Approved | Gate does not fail in the open position. Per Chief Carsten we are going to allow this for the protection of the animals. Gate will need to be maintained with the battery back up at all times. Fire service contracts are in place. Approval for C of O. | |
03/22/2018 | FIRE SPKLR - FINAL | Approved | ||
03/15/2018 | FIRE SPKLR - FINAL | Partial Approval | 1. Front Gate needs to fail in the open position – The front rolling gate has a battery backup system that will operate the gate if power is lost. The gate cannot fail open for this facility because animals could leave the property. If the battery is completely dead and the gate is not open, it can be pushed open because there will not be power to the clutches. 2. Need site plan with building numbers 3. Add a strobe in the walk-in cooler 4. Remove small wires from fire sprinklers 5. Relocate/add 3 heads – 2 heads have been moved. According to our Site Superintendent Chuck Grondin, you will discuss the third head with Harvey when he returns and if it is needed, it will be added. 6. Provide pipe insulation on exterior sprinkler piping 7. Provide documentation for service contracts for Fire Sprinkler, Fire Alarm, and Fire Extinguishers |
|
03/01/2018 | FIRE SPKLR - FINAL | Partial Approval | need to relocate skrim to 1" above the heads fire sprinkler heads that are painted/taped please replace/clean Attache heads properly |