Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2017 | FRAMING | Approved | ||
| 05/03/2017 | FRAMING | Partial Approval | PENDING ALL TRADES PENDING BREAKTHROUGH H-3 HEADER |
|
| 04/28/2017 | FRAMING | Denied | NO CORRECTIONS HAVE BEN MADE FROM PREVIOUS INSPECTION. PROVIDE SAFE ACCESS TO ROOF AND 2ND FLOOR NAIL PROTECT PLUMBING THROUGHOUT |
|
| 04/27/2017 | FRAMING | Denied | NO TEST DWV POTABLE WATER OK SEAL TOP PLATE PENETRATIONS PROVIDE PLUMBING PLAN PROVIDE ACCESS UPSTAIRS STOPPED INSPECTION |
|
| 03/28/2017 | FRAMING | Not ready for Inspection | PROVIDE 1/2" FOR DEFLECTION AT 2 -PT BEARING TRUSSES AT FINAL FRAME INSPECTION |