Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2021 | ENGINEERING - FINAL | Approved | APPROVED | |
| 02/28/2020 | ENGINEERING - FINAL | Continued | ARMANDO QUIROZ AND I WENT TO THE SITE TO PERFORM THE FINAL INSPECTIONS BUT WERE UNABLE TO COMPLETE SINCE THE FIR DEPARTMENT HAD NOT PERFORMED THEIR INSPECTIONS. WE WERE ASKED TO RESCHEDULE AND COME BACK TO THE SITE AT A LATER DATE, THEY WERE TO HAVE A STATE INSPECTION OF THE SITE AT AROUND 9:00 AM. WE PROVIDE THE SITE WITH THE PERMIT NUMBER ASKED THAT THEY CONTACT OUR OFFICE AND REACTIVATE THE PERMIT AND THEN SCHEDULE ALL OF THE REMAINING INSPECTIONS FOR A LATER DATE. WE ALSO ADVISED THEM THAT THERE APPEARED TO BE SOME DRAINAGE ISSUE POSSIBLY WITH THE FIRE SYSTEM THAT WAS CAUSING A LARGE DISCHARGE OF WATER FROM WITHIN THE BUILDING. WE LEFT THE SITE BEFORE THE OTHER INSPECTORS ARRIVED. | |
| 12/05/2017 | ENGINEERING - FINAL | Approved | ||
| 12/01/2017 | ENGINEERING - FINAL | Cancelled | IVRS - RI canceled | |
| 11/08/2017 | ENGINEERING - FINAL | Denied | 1) APPROVED PLANS SHOW HC PARKING AND ACCESS. 2) APPROVED PLANS SHOW BICYCLE PARKING AND VEHICLE PARKING. 3) COMPLETE SITE WORK PER APPROVED PLANS OR CHANGE APPROVED PLANS TO SHOW WHAT WAS BUILT |