Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2016 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/15/2016 | PLUMBING - GAS PRESSURE TEST | Denied | 1- SHALL CONNECT THE FLU VENT FOR THE GAS PACK WITH (3) SHEET METAL SCREWS PER JOINT. 2- SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT ON THE WATER HEATER FLU VENT. 3- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR. 4- SHALL BOND THE GAS LINE. |