Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/04/2016 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 11/02/2016 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE THE REQUIRED TEST GAGE OF 15 LBS. MAX WITH 1/10TH INCREMENTS FOR THE AIR PRESSURE TEST. 2- SHALL PROVIDE A 1" CLEARANCE AROUND COMBUSTIONABLE MATERIAL FOR THE WATER HEATER DBL. WALL FLU VENT THRU ROOF. 3- SHALL PROVIDE DBL. WALL FLU VENT FOR THE WATER ALL THE WAY TO THE DRAFT COLLAR. SINGLE WALL FLU VENT IS NOT APPROVED IN A EXTERIOR LOCATION. 5- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR LOCATED NEAR THE GAS RANGE. * |