Permit: T16CM08237

Parcel: 141185930


Addresses:

10235 E OLD VAIL RD

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
07/18/2017 ENGINEERING - FINAL Approved
07/14/2017 ENGINEERING - FINAL Partial Approval COMPLETE ALL WORK ON THE EXTERIOR OF THIS SITE PRIOR TO CALLING IN FOR THE FINAL, THIS WILL INCLUDE LANDSCAPIN AND DG, GENERAL CLEANUP, AND REPAIRS TO ANYTHING IF DAMAGED PRIOR TO THE FINAL INSPECTION.
07/14/2017 ENGINEERING - FINAL Approved THE FUTURE PATIO HAS NOT BE CONSTRUCTED, BUT THE CONTRACTOR WILL BE PLACING STABALIZING MATERIAL IN THE AREA UNTIL THEY ARE READY TO PULL THE PERMIT.
07/13/2017 ENGINEERING - FINAL Partial Approval SITE WORK NOT READY AT THIS TIME, CREWS ARE STILL WORKING ON THE HANDICAP PARKING SPACES, ONE IS COMPLETE BUT THE OTHER IS NOT
06/30/2017 ENGINEERING - FINAL Partial Approval OK FOR THE TCO FOR STOCKING AND TRAINING PURPOSES ONLY, BUT NOT FOR OCCUPANCY OR THE SALE OF GOODS TO CUSTOMERS, THIS WILL REQUIRE ADDITIONAL INSPECTIONS AND APPROVALS.
COMPLETE ALL OF THE INSPECTIONS PREVIOUSLY MENTIONED IN PAST INSPECTIONS 1) COMPLETE LANDSCAPING, AND REMOVE CONSTRUCTION MATERIAL AND EQUIPMENT.
2) HC PARKING DOES NOT MEET ADA. SLOPES ARE GREATER THAN 2% FOR PARKING, LOADING AND UNLOADING.
06/26/2017 ENGINEERING - FINAL Denied 1) COMPLETE LANDSCAPING, AND REMOVE CONSTRUCTION MATERIAL AND EQUIPMENT.
2) HC PARKING DOES NOT MEET ADA. SLOPES ARE GREATER THAN 2% FOR PARKING, LOADING AND UNLOADING.
06/26/2017 ENGINEERING - FINAL Partial Approval OK FOR TCO STOCKING AND TRAINING ONLY NO OCCUPANCY ALLOWED AT THIS TIME, SEE THE OTHER NOTES FROM MIKE RUSSO FOR ADDITIONAL ITEMS THAT NEED ATTENTION.
THE FOLLOWING ITEMS HAVE BEEN NOTED BY ME ON THIS DATE: 1) ADA PARKING SPACES AND ACCESS AISLES ARE NOT COMPLIANT AND OVER ON THE RUNNING AND CROSS SLOPES. 2) HANDRAIL MISSING FROM THE PATIO AREA. 3) COMPLETE ALL THE LANDSCAPING ITEMS AND PLACEMENT OF THE PRESCRIBED GROUND COVER IN ALL AREAS. 4) REMOVE ALL EXCESS CONSTRUCTION MATERIALS, STOCKPILES, FROM THE SITE, AS-WELL-AS TEMPORARY TRASH DUMPSTERS AND STORAGE FACILITIES(CON-EX). 5) GENERAL SITE CLEANUP OF ALL DEBRIS AND TRASH TO ENSURE PEDESTRIAN SAFETY TO AND THROUGH THE SITE.
06/02/2017 ENGINEERING - FINAL Continued 1) CONSTRUCT SITE WORK PER APPROVED PLAN
2) ENSURE DISTURBED SOIL STAYS ON SITE DURING CONSTRUCTION
3) ENSURE PEDESTRIAN ACCESS MEETS ADA