Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/15/2018 |
ENGINEERING - FINAL |
|
Approved |
|
| 11/09/2018 |
ENGINEERING - FINAL |
|
Denied |
2 inch black top / 4 in of ABC is specified on the plan. Provide the city approve plan for the method and material used contrary to the plan specs. Clean out in accessible sidewalk shall be flush and protected with an approved clean-out cover, Frank pattern clean-out cover |
| 10/29/2018 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
Complete the work shown on plan, asphalt with parking spaces and accessible route from Street to building. Remove temporary fencing. Elevation cert required prior to final. |
| 10/25/2016 |
ENGINEERING - FINAL |
|
Prior to Final Inspectn |
Requires Elevation Certificate prior to final inspection. |