Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
Permit Number - T16CM07954
Inspection Description - ELECTRIC - FINAL
Inspection Status - Not ready for Inspection
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2019 | ELECTRIC - FINAL | Not ready for Inspection | plans need to be revised or grayed out reflecting what work has actually been done. Proposed carport and porch has been completed while the porch and den addition work have not, this makes the drawings very confusing, can’t final out a permit with work that hasn’t been completed as long as that work is part of the permitted drawings |