Inspection Status: Not ready for Inspection
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/07/2018 |
BUILDING - FINAL |
|
Not ready for Inspection |
exterior lights need to be installed at all egress points, need to get pool permit closed due to doors that open onto pool deck on this permit which are not alarmed. |