Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2016 | MECHANICAL - INTERMEDIATE | Approved | ||
| 12/14/2016 | MECHANICAL - INTERMEDIATE | Denied | 4th inspection; again min 1" clearance req for B-vent, plumb and align joints dn strs |
|
| 12/13/2016 | MECHANICAL - INTERMEDIATE | Denied | Work covered prior to approval; 109.3 Exspose B vent dn stairsand upstairs. Provie a ladder to check dwv for test. |
|
| 12/09/2016 | MECHANICAL - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 12/09/2016 | MECHANICAL - INTERMEDIATE | Denied | PVC joints require the use of PVC PRIMER per code. Support line set tubing close to appliance connection and in wall. Support line set tubing above ceiling, protect tubing from safety plate. Repair top plate; over notched. Type B vent may not offset more than 60 from vert. requires 1" clearance from combustibles Support exhaust duct |
|
| 12/08/2016 | MECHANICAL - INTERMEDIATE | Denied | PVC joints require the use of PVC PRIMER per code. Support line set tubing close to appliance connection and in wall. Support line set tubing above ceiling, protect tubing from safety plate. Repair top plate; over notched. Seal torn insulation. Correct the slope and supports of condensate drains. Type B vent may not offset more than 60 from vert. requires 1" clearance from combustibles Support exhaust duct |
|
| 12/07/2016 | MECHANICAL - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* |