Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2016 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/20/2016 | PLUMBING - FINAL | Partial Approval | correct tpr and drain | |
| 10/12/2016 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE (3) SHEET METAL SCREWS PER JOINT ON THE WATER HEATER FLU VENT CONNECTOR. 2- SHALL SEAL T & P DRAIN AND GAS LINE PENETRATION THRU EXTERIOR WALL. 3- SHALL PROVIDE A 90 ON THE T & P DRAIN AND TERMINATE 6" A.F.F. 4- PROVIDE A CARBON MONOXCIDE DETECTOR IN HALLWAY. * |
|
| 10/07/2016 | PLUMBING - FINAL | Not ready for Inspection | will allow clr; replace damaged T P safety valve and terminate with approved piping. Secure vent connectors. provide access |