Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/28/2016 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 10/20/2016 | PLUMBING - FINAL | Not ready for Inspection | ||
| 10/12/2016 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SEE COMMENT #5 AS REQUESTED. * |
|
| 10/04/2016 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- gAS PRESSURE TEST PROVIDED. 2- SHALL PROVIDE A CARBON MONOXCIDE DETECTOR WITH FRESH BATTERIES. 3- SHALL SEAL THE ROOF PENETRATIONS. 4- SHALL BOND THE GAS LINE. 5- SHALL PROVIDE A MINIMUM OF 1" CLEARANCE AROUND COMBUSTIONABLE MATERIAL FOR THE WATER HEATER DBL WALL FLU VENT IN WATER HEATER ENCLOSURE. 6- SHALL EXTEND THE T & P DRAIN AND TERMINATE A MINIMUM OF 6" A.F.F. * |