Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/07/2016 | BUILDING PRE-SLAB | Approved | OK TO POUR SLABS. | |
| 10/03/2016 | BUILDING PRE-SLAB | Denied | SLAB FOOTINGS NOT PER PLAN. THE STOOP REQUIRES F2 FOOTING PER PLAN. THE SLAB REQUIRES F1 FOOTINGS PER PLAN. NO STEEL TO BE IN CONTACT WITH THE EARTH. USE ISOLATION TAPE AT VERTICLE REBAR SUPPORTS. PLANS ALSO REQUIRE FOOTINGS ALONG BOTH COOLERS. * |
|
| 09/27/2016 | BUILDING PRE-SLAB | Denied | FOOTERS ARE NOT DUG TO DETAIL 1 ON PAGE A-1. NO INDICATION ON PRINTS THAT A REBAR MAT IS ALLOWED FOR FOOTER SUBSTITUTION. |